Made in China
Steam Turbine Power Plant Setup Suppliers in China
An oil-fired once-through steam boiler produces wet steam that is turned into superheated steam by means of a super heater.
The boiler’s short heat-up time means rapid steam generation is possible.
Load is applied to the turbine with a generator.
The turbine output is determined by speed and torque.
The feed water circuit is fitted with a complete water treatment system, which consists of a regenerable ion exchanger and chemical dosing.
Downstream of the turbine, the steam is condensed and returned to the boiler.
Sensors record the temperature, pressure, speed, and flow rate at all relevant points.
The measured values can be read on digital displays.
At the same time, the measured values can also be transmitted directly to a PC via USB.
The data acquisition software is included.
The control panel includes a clear process schematic of the plant.
The system is monitored and controlled by a programmable logic controller (PLC).
The experimental plant is built in accordance with statutory safety regulations and includes the mandatory safety facilities.
The steam generator is type tested and does not require specific permissions.
The plant can optionally be operated with the cooling tower.
Steam power plant and its components
Start-up, operation and shut down of a steam power plant
Closed steam-water circuit with feed water treatment
Among others, determining:
Boiler efficiency
Mechanical/thermal efficiency of the turbine
Condenser efficiency
Specific fuel consumption of the plant
As leading steam turbine power plant setup suppliers in china manufacturers, suppliers & exporters in China, Engineering Lab China combines factory-direct pricing, strict quality control and reliable worldwide shipping. Every Steam Turbine Power Plant Setup Suppliers in China is built in-house in Guangzhou City to deliver dependable performance for engineering training and teaching environments.
We manufacture every Steam Turbine Power Plant Setup Suppliers in China at our own facility in Guangzhou, China. No middlemen — you get factory pricing on Engineering Laboratory Trainer Kits, Training Charts and Educational Equipment.
Every Steam Turbine Power Plant Setup Suppliers in China passes a strict outward quality check before dispatch, so it stands up to daily use in Industrial Training Institutions, Engineering Colleges & Polytechnics.
From a single trainer kit to a full lab tender, our team manages packaging and prompt international delivery so your Steam Turbine Power Plant Setup Suppliers in China arrives on schedule, anywhere in the world.
EngineeringLabChina is a leading steam turbine power plant setup suppliers in china manufacturers, steam turbine power plant setup suppliers in china suppliers & exporters in China. Whether you need a single unit for a lab refresh or a complete tender for a polytechnic, we handle Engineering, Procurement, Installation and Commissioning under one roof.
We accept Wire or Telegraphic Transfer / Letter of Credit. Shipping is based on consignment size — contact us with your requirement for an accurate quote.
Share quantity, destination country and any custom specs for the Steam Turbine Power Plant Setup Suppliers in China.
Our team replies with factory pricing, lead time and shipping options within 24 hours.
We manufacture in Guangzhou, run a quality check and prepare export-ready packaging.
Consignment dispatched by your preferred mode — sea, air or courier — to your door.
Full product category index — manufactured in Guangzhou, exported worldwide.