Made in China
Multi Turbine Test Rig
Designed for study of turbine characteristics under various flow rates and heads.
Includes pump, storage tanks, turbine units connected in parallel, dynamometer for each turbine, and instrumentation for measuring flow rate, speed, and torque.
For determining the turbine power, the eddy current brake is equipped with a force sensor for torque measurement.
The speed is captured by means of an inductive, non-contact position sensor at the turbine shaft.
The pressures at the inlet and outlet of the turbine, the temperature and the flow rate are recorded with sensors.
The recorded measured values are displayed digitally and processed further in a PC.
The PC is used to calculate the power output data of the examined turbine and to represent them in characteristic curves.
FEATURES:
Closed water circuit contains multistage centrifugal pump, tank, and inductive flow meter and flow control valve.
Connection to the turbines via flexible hose with quick-release coupling.
Constant torques and speeds can be adjusted.
Digital display for flow rate, pressure and temperature.
Braking torque and speed measured.
Torque vs. speed at various heads and flow rates.
Power output vs. speed for various heads and flow rates.
Efficiency vs. speed for a given head and flow rate.
Racing characteristics.
Supply unit for turbine.
SPECIFICATIONS:
Pelton turbine:
Construction: Stainless steel runner and nozzle.
Stainless steel casing with transparent window to observe hydraulic action.
Maximum power: 400 W of brake power.
Francis turbine:
Construction: Metal runner: Non-corrosion metal
Casing with adjustable guide vanes and transparent window to observe guide vane position.
Maximum power: 400 W of brake power.
Cross Flow turbine:
Construction: Stainless steel runner, and nozzle.
Stainless steel casing with transparent window.
Maximum power: 400 W of brake power.
Pump: 2.2kw.
Dynamometer: Water brake absorber.
Measuring instruments:
Torques: Spring balances absorber.
Pressures: Pressure gauges at turbine inlets.
Sensors with digital display: Flow rate and speeds.
Power supply: 220 V, 1Ph, 50 Hz.
As leading multi turbine test rig manufacturers, suppliers & exporters in China, Engineering Lab China combines factory-direct pricing, strict quality control and reliable worldwide shipping. Every Multi Turbine Test Rig is built in-house in Guangzhou City to deliver dependable performance for engineering training and teaching environments.
We manufacture every Multi Turbine Test Rig at our own facility in Guangzhou, China. No middlemen — you get factory pricing on Engineering Laboratory Trainer Kits, Training Charts and Educational Equipment.
Every Multi Turbine Test Rig passes a strict outward quality check before dispatch, so it stands up to daily use in Industrial Training Institutions, Engineering Colleges & Polytechnics.
From a single trainer kit to a full lab tender, our team manages packaging and prompt international delivery so your Multi Turbine Test Rig arrives on schedule, anywhere in the world.
EngineeringLabChina is a leading multi turbine test rig manufacturers, multi turbine test rig suppliers & exporters in China. Whether you need a single unit for a lab refresh or a complete tender for a polytechnic, we handle Engineering, Procurement, Installation and Commissioning under one roof.
We accept Wire or Telegraphic Transfer / Letter of Credit. Shipping is based on consignment size — contact us with your requirement for an accurate quote.
Share quantity, destination country and any custom specs for the Multi Turbine Test Rig.
Our team replies with factory pricing, lead time and shipping options within 24 hours.
We manufacture in Guangzhou, run a quality check and prepare export-ready packaging.
Consignment dispatched by your preferred mode — sea, air or courier — to your door.
Full product category index — manufactured in Guangzhou, exported worldwide.